Open a project and choose the Gantt tab. Work items with a start or end date appear as bars.
Drag a bar to move it, or drag either end to change one date. Click an empty row to schedule an item that has no dates.
Edited items get a dashed outline. Press Save, check the list of changes, and confirm. Discard drops them all; Undo (Ctrl+Z) steps back one change at a time.
To chart work from several projects at once, open Apps → Keel Gantt and pick one of your saved filters, or type JQL.
How your work is kept safe
Nothing is written until you save. Changes sit in a draft that survives a reload.
You see every change first. Save opens a list with the old and new dates and a tick beside each. Untick anything you do not want written; it stays in your draft.
Only dates are written. The app never creates, deletes or re-ranks work items, and never touches another field.
No silent overwrites. If a teammate changed an item after you edited it, that item is held back and marked in red. You decide whether to overwrite it or discard your change.
You can undo a save. “Undo last save” puts those items back, for up to a day. Anything changed by someone else since then is left alone.
Features
Your date fields. A project administrator chooses the start and end date fields in Settings. If most of a project's dates sit in another app's fields (WBS Gantt-Chart, BigGantt, Jira Plans), the chart offers to use those instead.
Working days. Monday to Friday by default; change them in Settings.
Linked items move together. Move an item later and the items it blocks are pushed just far enough to stay after it. Done items are never moved. Turn it off with the “Move linked items” tick box.
Critical path. Outlines the items that decide the end date, counted in working days.
Baselines. Save the plan as a named baseline (up to ten per project) and see how far each item has moved, in days.
Late items. An item that is not done and whose end date has passed shows an orange mark on its bar and, beside its name, how many working days late it is. The Late button in the toolbar counts them; press it to see only those, with their parents. An item with no end date is never late.
Progress. A parent shows the share of the items under it that are done, and the header shows the figure for the whole chart. It counts finished items, not days. While “Hide done work items” is on in Settings, the percentage is not shown.
Milestones. An item is drawn as a diamond on its end date when its work type is called “Milestone” or it carries the label milestone. Drag it or use the arrow keys to move it; only the dates it already has are changed.
Large plans. Up to 10,000 work items in one chart. The label above the list shows how long the last load took, on your own data.
Export. PDF (A4 landscape) or PNG, built in your browser.
Keyboard
Keys
What they do
Tab
Move to the next bar on screen
Left / Right
Move the bar one day
Shift + Left / Right
Change the end date
Alt + Left / Right
Change the start date
Up / Down
Go to the row above or below
Enter on an unscheduled row
Schedule it from today
Ctrl + Z
Undo
FAQ
Why is the chart read-only for a moment when I open it? It is showing the copy your browser kept from last time while the latest is read from Jira. Editing unlocks as soon as that arrives.
Why didn't a linked item move? Either there was already room between the two items, the linked item is done, it is not in this chart, or you moved the first item earlier rather than later. The notice after a move names any done items that were left where they are.
Bars are striped or faded. The item has only one of its two dates. Moving it keeps the other empty, on purpose. Drag an end, or use Shift or Alt with an arrow key, to set it.
An item wasn't saved. It is marked in red with the reason. Usually someone else changed its dates after you edited it. Your edit is still in the draft: reload to see their change, or choose “Overwrite their changes”.
Why is “Save baseline” greyed out? Saving a baseline on a project needs permission to edit that project's work items.
Why can't I change Settings? A project's settings belong to its administrators. On the site-wide Keel Gantt page, the settings are your own.
Does saving send notifications? Jira notifies watchers of each item saved, as it does for any edit.
What does a red arrow mean? A blocked item starts before the item blocking it ends.
My plan has more than 10,000 items. The chart shows the first 10,000 in board order and says so. Narrow it down with JQL.
The text in the exported PDF can't be selected. Each page of the PDF is an image.